Capacity

200 m³/day

Client

Jiangsu Trina Storage

Location

Jiangsu, China

Construction Period

April 2023

Zero Liquid Discharge (ZLD) Wastewater Treatment System for an Energy Storage System Pilot Production Line – Jiangsu Trina Storage

Treatment scope:

The wastewater consists of two streams:

  1. Wastewater from cathode production: mainly lithium cobalt oxide, conductive carbon, PVDF, CMC (sodium carboxymethyl cellulose), NMP solvent and aluminum foil.
  2. Wastewater from anode production: mainly graphite, conductive carbon, SBR (styrene-butadiene rubber), deionized water used as a solvent, and copper foil.

Project name: Zero liquid discharge (ZLD) wastewater treatment system for a pilot production line.

Client: Jiangsu Trina Energy Storage Co., Ltd. 江苏天合储能有限公司

Treatment capacity: 200 m³/day

Construction period: April 2023

4.1 Process Flow
4.1 Process Flow

Project Information

Treatment Capacity

200 m³/day

Wastewater Type

Cathode and anode wastewater

Process Flow

As per the project's process flow diagram.

Have a Question?

Contact Us for Service Consultation

Hotline / Zalo: 0862 791 142

Contact us for tailored solutions and a suitable quote.

Data Protection

We always keep our customers' information confidential