Capacity

350 m³/day

Client

Zhuhai Saiwei

Location

Zhuhai, Guangdong, China

Construction Period

September 2024

Treatment and Reuse System for Wastewater from a Battery Electrolyte Production Line – Zhuhai Saiwei

Treatment scope:

Wastewater with high organic concentration, containing fluoride and characteristic metal ions. Treatment focuses on removing fluoride, organics and salts.

Project name: Treatment and reuse system for wastewater from a battery electrolyte production line.

Client: Zhuhai Saiwei Electronic Materials Co., Ltd. 珠海市赛纬电子材料股份有限公司

Treatment capacity: 350 m³/day

Construction period: September 2024

9.1 Process Flow
9.1 Process Flow

Project Information

Treatment Capacity

350 m³/day

Wastewater Type

High-organic, fluoride-containing wastewater

Process Flow

As per the project's process flow diagram.

Have a Question?

Contact Us for Service Consultation

Hotline / Zalo: 0862 791 142

Contact us for tailored solutions and a suitable quote.

Data Protection

We always keep our customers' information confidential