Battery Electrolyte Wastewater Treatment and Reuse System – Zhuhai Saiwei
- Home
- Battery Electrolyte Wastewater Treatment and Reuse System – Zhuhai Saiwei
Capacity
350 m³/day
Client
Zhuhai Saiwei
Location
Zhuhai, Guangdong, China
Construction Period
September 2024
Treatment and Reuse System for Wastewater from a Battery Electrolyte Production Line – Zhuhai Saiwei
Treatment scope:
Wastewater with high organic concentration, containing fluoride and characteristic metal ions. Treatment focuses on removing fluoride, organics and salts.
Project name: Treatment and reuse system for wastewater from a battery electrolyte production line.
Client: Zhuhai Saiwei Electronic Materials Co., Ltd. 珠海市赛纬电子材料股份有限公司
Treatment capacity: 350 m³/day
Construction period: September 2024
Project Information
Treatment Capacity
350 m³/day
Wastewater Type
High-organic, fluoride-containing wastewater
Process Flow
As per the project's process flow diagram.
Have a Question?
Contact Us for Service Consultation
Hotline / Zalo: 0862 791 142
Contact us for tailored solutions and a suitable quote.
Data Protection
We always keep our customers' information confidential