Capacity

1,000 m³/day

Client

Saiwate

Location

Shandong, China

Construction Period

March 2025

Water Treatment System for Project S2 – Saiwate

Treatment scope:

Purification of water with high turbidity and high suspended solids content.

Project name: Water treatment system for Project S2.

Client: Saiwate Power Technology (Shandong) Co., Ltd. 赛瓦特动力科技(山东)股份有限公司

Treatment capacity: 1,000 m³/day

Construction period: March 2025

18.1 Process Flow Diagram
18.1 Process Flow Diagram

Project Information

Treatment Capacity

1,000 m³/day

Water Type

High-turbidity water

Process Flow

As per the project's process flow diagram.