Water Treatment System for Project S2 – Saiwate
- Home
- Water Treatment System for Project S2 – Saiwate
Capacity
1,000 m³/day
Client
Saiwate
Location
Shandong, China
Construction Period
March 2025
Water Treatment System for Project S2 – Saiwate
Treatment scope:
Purification of water with high turbidity and high suspended solids content.
Project name: Water treatment system for Project S2.
Client: Saiwate Power Technology (Shandong) Co., Ltd. 赛瓦特动力科技(山东)股份有限公司
Treatment capacity: 1,000 m³/day
Construction period: March 2025
Project Information
Treatment Capacity
1,000 m³/day
Water Type
High-turbidity water
Process Flow
As per the project's process flow diagram.