Air Flow Rate

15,000 m³/h

Client

Yuedong New Energy

Location

Zhejiang, China

Construction Period

June 2022

Compliant Waste Gas Treatment System for an Energy Storage Battery Production Line – Yuedong New Energy

Treatment scope:

VOCs purification equipment was added to treat waste gas generated mainly during electrolyte filling of the batteries. During normal production, the electrolyte and vacuum pump oil can volatilize and produce waste gas, consisting mainly of dimethyl carbonate, ethyl methyl carbonate, diethyl carbonate and a small amount of HF.

Project name: Compliant waste gas treatment system for an energy storage battery production line.

Client: Yuedong New Energy Technology (Zhejiang) Co., Ltd. 跃动新能源科技(浙江)有限公司

Air flow rate: 15,000 m³/h

Construction period: June 2022

17.1 Process Flow
17.1 Process Flow

Project Information

Air Flow Rate

15,000 m³/h

Waste Gas Type

VOCs waste gas

Process Flow

As per the project's process flow diagram.

Have a Question?

Contact Us for Service Consultation

Hotline / Zalo: 0862 791 142

Contact us for tailored solutions and a suitable quote.

Data Protection

We always keep our customers' information confidential