EHS Wastewater Treatment for Midea Thailand – Phase 1, Sheet Metal Processing Wastewater
- Home
- EHS Wastewater Treatment for Midea Thailand – Phase 1, Sheet Metal Processing Wastewater
160 m³/day
Midea (Thailand)
Thailand
June 2021
EHS Wastewater Treatment Project for the Midea Plant in Thailand – Phase 1, Treatment of Sheet Metal Processing Wastewater
Technology application scope:
Treatment of wastewater from industrial sheet metal processing, where the main pollutants are COD, SS and oil and grease.
Client: Midea (Thailand)
Project scale: 160 m³/day
Construction period: June 2021
Treatment process: Wastewater → Concentrate tank → Equalization tank → Oil separation tank → Equalization tank → Electrocoagulation reactor → Inclined tube settler → Flotation tank → Activated carbon filtration → Compliant discharge.
Project Information
Project Scale
160 m³/day
Wastewater Type
Sheet metal processing wastewater (COD, SS, oil and grease)
Process Flow
Wastewater → Concentrate tank → Equalization tank → Oil separation tank → Equalization tank → Electrocoagulation reactor → Inclined tube settler → Flotation tank → Activated carbon filtration → Compliant discharge.