2,200 Tons/Day Wastewater Treatment System for Lithium Battery Anode Materials – Guangxi Chenyu (Phase 1)
- Home
- 2,200 Tons/Day Wastewater Treatment System for Lithium Battery Anode Materials – Guangxi Chenyu (Phase 1)
Capacity
2,200 tons/day
Client
Guangxi Chenyu (Phase 1)
Location
Guangxi, China
Construction Period
February 2023
2,200 Tons/Day Wastewater Treatment System for a Lithium Battery Anode Material Production Facility – Guangxi Chenyu (Phase 1)
Treatment scope:
Highly acidic inorganic wastewater with high fluoride and heavy metal content.
Project name: Wastewater treatment system for lithium battery anode material production (Phase 1).
Client: Guangxi Chenyu New Materials Co., Ltd. 广西宸宇新材料有限公司
Treatment capacity: 2,200 tons/day
Construction period: February 2023
Project Information
Treatment Capacity
2,200 tons/day
Wastewater Type
Acidic, fluoride and heavy metal wastewater
Process Flow
As per the project's process flow diagram.
Have a Question?
Contact Us for Service Consultation
Hotline / Zalo: 0862 791 142
Contact us for tailored solutions and a suitable quote.
Data Protection
We always keep our customers' information confidential


