Capacity

2,200 tons/day

Client

Guangxi Chenyu (Phase 1)

Location

Guangxi, China

Construction Period

February 2023

2,200 Tons/Day Wastewater Treatment System for a Lithium Battery Anode Material Production Facility – Guangxi Chenyu (Phase 1)

Treatment scope:

Highly acidic inorganic wastewater with high fluoride and heavy metal content.

Project name: Wastewater treatment system for lithium battery anode material production (Phase 1).

Client: Guangxi Chenyu New Materials Co., Ltd. 广西宸宇新材料有限公司

Treatment capacity: 2,200 tons/day

Construction period: February 2023

10.1 Process Flow
10.1 Process Flow

Project Information

Treatment Capacity

2,200 tons/day

Wastewater Type

Acidic, fluoride and heavy metal wastewater

Process Flow

As per the project's process flow diagram.

Have a Question?

Contact Us for Service Consultation

Hotline / Zalo: 0862 791 142

Contact us for tailored solutions and a suitable quote.

Data Protection

We always keep our customers' information confidential